Results

10 MW running 4,818 h/yr produces 884 t of hydrogen a year at a levelized cost of 4.52 €/kg (biggest component: Electricity). That is below your 6 €/kg sale price, so the margin is positive.
Hydrogen production
884t/yr
2,422 kg/day average · 183 kg/h at full load
Levelized cost (LCOH)
4.52€/kg
136 €/MWh (LHV)
Electricity used
48.2GWh/yr
54.5 kWh/kg incl. degradation
Efficiency
61.2%
LHV · 72.3% HHV
Water consumption
13,262m³/yr
15 L/kg (stoichiometric 8.9)
Oxygen by-product
7,020t/yr
Stack replacements
1
every 16.6 years (80,000 h)
Total capex
€16,000,000
1,600 €/kW
Project NPV at sale price
€15,247,042
6 €/kg, 7% WACC
CO₂ avoided vs grey H₂
8,841t/yr
≈10 kg CO₂ per kg from unabated SMR
Equivalent uses
7,368 FCEVs
or 5,013 t ammonia · 2,959 m³ diesel-equivalent
LCOH breakdown
LCOH vs capacity factor

Electrolyzer technologies (typical 2023–2025 values)

TechnologySystem kWh/kgEfficiency (LHV)Stack life (h)Installed capex (€/kW)Notes
Alkaline (AEL)50–5561–67%60,000–90,0001,400–2,000mature, cheapest, slower ramping
PEM52–5857–64%50,000–80,0001,700–2,500compact, fast response, uses iridium/platinum
SOEC37–42 + heat75–85%20,000–40,0002,500–4,000+high temperature, best with waste heat/steam
AEM50–5758–66%<30,000early marketno PGMs, small units
  • LCOH = (capex × CRF + PV of stack replacements × CRF + O&M + electricity + water + heat) ÷ kg per year. Taxes, grid fees, storage, transport and subsidies are excluded.
  • Real plants rarely run at a flat capacity factor. On variable renewables, minimum-load limits and ramping cut output, while buffer storage or a grid top-up raises utilisation.
  • Capex ranges are wide and moving fast, and Chinese alkaline systems are quoted far below Western installed costs. Check the latest IEA Global Hydrogen Review figures.

Free calculator by GreenEnergy.net