Results

10.1 kW electrical at the design flow of 60 L/s and 27.5 m net head, about 64,558 kWh a year (capacity factor 73%). Best-suited turbine: Cross-flow (Banki–Michell). Pays back in about 5 years.
Electrical power at design flow
10.1kW
Cross-flow (Banki–Michell) · overall η 57% water-to-wire
Annual energy
64,558kWh
177 kWh per day on average
Capacity factor
73.3%
6,420 full-load hours
Net head
27.5m
friction + minor loss 2.54 m (8.5%)
Design flow
60L/s
mean 60 L/s · residual 6 L/s
Hydraulic power (net)
16.2kW
gross 17.7 kW = ρgQH
Penstock velocity
1.91m/s
Re 293,849 · f 0.0149
Year-1 value
€9,684
Payback
4 yr 11 mo
capex 45,248 €
LCOE
0.063€/kWh
IRR 21.3%
CO₂ avoided per year
25.8t
Monthly energy and stream flow
Turbine suitability score for your site

Turbine selection (net head, design flow)

TurbineHead range (m)Flow range (m³/s)Peak ηMin. flowFits your site
Cross-flow (Banki–Michell)2–2000.01–1072–80%15%✓ selected
Turgo10–3000.002–1078–85%15%✓
Pelton10–1,8000.001–5080–88%10%✓
Propeller / fixed-blade1.5–300.05–50078–88%70%✓
Francis10–7000.1–1,00084–92%40%—
Kaplan (double-regulated)1.5–400.3–1,00084–91%20%—
Archimedes screw1–100.1–1575–82%20%—

Monthly breakdown

MonthStream flow (L/s)Turbine flow (L/s)LoadPower (kW)Energy (kWh)
Jan8760100%10.17,107
Feb8460100%10.16,419
Mar7860100%10.17,107
Apr635795%9.636,586
May514575%7.755,477
Jun393355%5.683,882
Jul302440%4.072,874
Aug272135%3.532,496
Sep332745%4.63,149
Oct514575%7.755,477
Nov8160100%10.16,878
Dec9660100%10.17,107
  • Use a long-term mean flow. A single measurement in a wet month will badly overstate output.
  • Monthly flow follows a generic “Temperate rain-fed (winter high)” pattern. Real streams vary day to day, so a flow-duration curve from gauging data gives a better estimate.
  • Residual flow requirements are set by your water authority (often Q347 or 5–20% of mean flow). Permits, intake works and grid connection usually dominate small-hydro costs.