Results

LCOE is about 45.4 €/MWh, comfortably below a 70 €/MWh market price (margin 24.6 €/MWh). Largest cost component: Capital.
LCOE
45.4€/MWh
4.54 €-cents/kWh
Capital recovery
37.4€/MWh
82% of LCOE
Fixed O&M
8€/MWh
Fuel + variable O&M
0€/MWh
Carbon cost
0€/MWh
0 kg CO₂/MWh
Annual output per kW
1,577kWh/kW
1,577 full-load hours
Capital recovery factor
7.26%/yr
6% over 30 years
Interest during construction
3%
1-year build
Margin vs market
24.6€/MWh
LCOE breakdown (€/MWh)
Typical LCOE by technology (€/MWh, at 0 €/t CO₂)
Sensitivity: each input −20% / +20%

Technology comparison (typical inputs)

TechnologyCapex /kWCFLifeWACCLCOE /MWhkg CO₂/MWh
Solar PV, utility scale (your inputs)75018%306%45.40
Solar PV, residential rooftop1,40014%255%1020
Onshore wind1,20036%256%41.90
Offshore wind2,80045%257%87.50
Gas combined cycle (CCGT)1,00055%307%78370
Gas peaker (open cycle)75010%307%172.6561
Coal (supercritical)2,20060%407%80.2851
Nuclear (new large LWR)7,00090%607%106.60
Hydropower (large)2,80045%606%63.70
Geothermal (flash)4,00080%307%71.90
Biomass (dedicated)2,50075%257%113.40
  • Preset costs are typical global 2023–2024 values in USD-like money (IRENA, Lazard, IEA/NEA); actual projects vary widely by country, site and contract. Edit the inputs for your case.
  • LCOE is a real-terms, pre-tax, plant-gate metric. It ignores system costs (backup, storage, grid), differences in market value and subsidies, so compare dispatchable and variable technologies with care.

Free calculator by GreenEnergy.net