CalculatorsMapsCountriesRankingsCompareTechnologiesLearn Energy Explorer Solar & wind farms Glossary
Energy finance calculator

LCOE calculator: levelized cost of electricity for any power plant

Capex, fixed and variable O&M, fuel and heat rate, capacity factor, lifetime, WACC, construction time, degradation and carbon price → the levelized cost per MWh, broken down by component and compared across 11 technologies.

Editable share link Branded PDF report Free · no sign-up

Results

LCOE is about 45.4 €/MWh, comfortably below a 70 €/MWh market price (margin 24.6 €/MWh). Largest cost component: Capital.
LCOE
45.4€/MWh
4.54 €-cents/kWh
Capital recovery
37.4€/MWh
82% of LCOE
Fixed O&M
8€/MWh
Fuel + variable O&M
0€/MWh
Carbon cost
0€/MWh
0 kg CO₂/MWh
Annual output per kW
1,577kWh/kW
1,577 full-load hours
Capital recovery factor
7.26%/yr
6% over 30 years
Interest during construction
3%
1-year build
Margin vs market
24.6€/MWh
LCOE breakdown (€/MWh)
Typical LCOE by technology (€/MWh, at 0 €/t CO₂)
Sensitivity: each input −20% / +20%

Technology comparison (typical inputs)

TechnologyCapex /kWCFLifeWACCLCOE /MWhkg CO₂/MWh
Solar PV, utility scale (your inputs)75018%306%45.40
Solar PV, residential rooftop1,40014%255%1020
Onshore wind1,20036%256%41.90
Offshore wind2,80045%257%87.50
Gas combined cycle (CCGT)1,00055%307%78370
Gas peaker (open cycle)75010%307%172.6561
Coal (supercritical)2,20060%407%80.2851
Nuclear (new large LWR)7,00090%607%106.60
Hydropower (large)2,80045%606%63.70
Geothermal (flash)4,00080%307%71.90
Biomass (dedicated)2,50075%257%113.40
  • Preset costs are typical global 2023–2024 values in USD-like money (IRENA, Lazard, IEA/NEA); actual projects vary widely by country, site and contract. Edit the inputs for your case.
  • LCOE is a real-terms, pre-tax, plant-gate metric. It ignores system costs (backup, storage, grid), differences in market value and subsidies, so compare dispatchable and variable technologies with care.

How this LCOE calculator works

The levelized cost of electricity answers one question: what average price per MWh does this plant need to pay for itself over its life? It works for any generating technology. Start from one of 11 presets (utility and rooftop solar, onshore and offshore wind, gas combined cycle and peaker, coal, nuclear, hydro, geothermal and biomass), then overwrite any input with your own project data.

Every cost and every MWh is discounted to the present at your real WACC. A euro spent in year 20 counts for less than one spent during construction, and the same goes for a MWh produced in year 20. Five components are levelized separately and stacked: capital recovery (including interest during construction and optional decommissioning), fixed O&M, variable O&M, fuel and carbon. A sensitivity chart shows which input moves the answer most, and a comparison chart runs all 11 technologies at your carbon price.

The formula

LCOE = Σ (I_t + M_t + F_t + C_t) / (1 + r)^t ÷ Σ E_t / (1 + r)^t

Capital = capex × IDC ÷ Σ [8.76 × CF × (1 − d)^(t−1) / (1 + r)^t] (per kW, MWh per kW-year) Fuel = heat rate (GJ/MWh) × fuel price (per GJ) Carbon = heat rate × fuel CO₂ factor (t/GJ) × carbon price IDC = average of (1 + r)^(k − 0.5) over the construction years k

Without degradation and construction time, the capital term reduces to the familiar capex × CRF ÷ (8.76 × CF), where CRF = r(1+r)ⁿ / ((1+r)ⁿ − 1) is the capital recovery factor.

Worked example: a utility-scale solar farm

The defaults describe a typical 2024 solar project: 750 per kW overnight capex, 12 per kW-year fixed O&M, an 18% capacity factor (1,577 kWh per kW per year), 30-year life, 0.5%/yr degradation, one year of construction and a 6% real WACC.

  • Capital recovery factor at 6% over 30 years: 7.26% per year
  • Interest during construction adds 3.0% to capex (half a year at 6%)
  • Capital: ≈ 37.4 per MWh (82% of the total)
  • Fixed O&M: ≈ 8.0 per MWh
  • LCOE ≈ 45.4 per MWh, or 4.5 cents per kWh, in line with IRENA’s 2023 global average for solar of 44 USD/MWh.

Switch to the gas CCGT preset and the picture flips. Capital is only ~20 per MWh, but fuel at 8 per GJ adds ~53, and a carbon price of 70 per tonne adds another ~26.

How to read the results

  • LCOE is the break-even average price in real money. Compare it with the price the plant can actually earn. For solar and wind that is the capture price, often 10–40% below baseload averages in markets with a lot of renewables.
  • The breakdown tells you where to look. Capital-heavy technologies respond to cheaper finance, fuel-heavy ones to fuel and carbon prices.
  • The sensitivity chart shows the LCOE when each input moves by ±20%.

Typical inputs (2023–2024, USD-like money)

Technology Capex /kW Fixed O&M /kW-yr CF Life Typical LCOE /MWh
Solar PV utility 600–1,000 8–17 15–28% 25–35 30–60
Solar PV rooftop 1,000–2,500 15–30 11–18% 25 70–150
Onshore wind 1,000–1,700 25–45 25–45% 25–30 30–70
Offshore wind 2,500–4,500 60–110 40–55% 25–30 70–140
Gas CCGT 800–1,300 12–25 40–70% 30 45–110 (fuel-driven)
Coal 1,500–4,000 35–80 50–80% 40 65–170
Nuclear (new) 5,000–12,000 100–160 85–93% 60 90–220

Tips to lower LCOE

  1. Cheaper capital beats cheaper hardware for renewables: one percentage point of WACC is worth roughly 6–8% of LCOE.
  2. Raise the capacity factor with better sites, trackers, taller turbines and higher DC/AC ratios.
  3. Extend life with quality components and repowering. Running 35 years instead of 25 cuts capital cost per MWh by 10–15%.
  4. Build faster. Long construction piles up interest, especially for nuclear and large hydro.
  5. On thermal plants, efficiency decides a lot. One point of efficiency on a CCGT saves about 1 per MWh with gas at 8 per GJ.

Limitations

LCOE is a plant-level, real, pre-tax indicator. It ignores taxes, subsidies, inflation, revenue profile and system costs, and it assumes fuel and carbon prices stay constant in real terms, as does the capacity factor (fossil plants often run less as renewables grow). Preset values are typical global figures; costs in a given country can be half or double. Use the NPV & IRR calculator for a tax- and debt-aware cash-flow view.

Method & assumptions

LCOE = [Σ (capext + O&Mt + fuelt + carbont) / (1 + r)t] ÷ [Σ Et / (1 + r)t]. Capex is spread evenly over the construction years and compounded to the commissioning date (interest during construction). Energy per kW = 8.76 MWh × capacity factor, reduced each year by degradation. Fuel cost per MWh = heat rate × fuel price; carbon cost = heat rate × fuel CO₂ factor × carbon price. Fixed O&M is per kW-year and is levelized over discounted energy.

Frequently asked questions

What is LCOE?
The levelized cost of electricity is the constant price per MWh at which a power plant would exactly recover all its costs over its lifetime (construction, financing, operation, fuel and carbon) at a given discount rate. It is the standard yardstick for comparing what different generating technologies cost.
What is the LCOE of solar and wind today?
IRENA reports global weighted-average LCOEs for projects commissioned in 2023 of about 0.044 USD/kWh for utility-scale solar PV, 0.033 USD/kWh for onshore wind and 0.075 USD/kWh for offshore wind. Lazard's 2024 US ranges (unsubsidised) are roughly 29–92 USD/MWh for utility solar and 27–73 USD/MWh for onshore wind.
Why does the discount rate (WACC) matter so much?
For capital-intensive plants such as solar, wind, hydro and nuclear, 70–90% of LCOE is capital recovery. Raising the WACC from 4% to 10% pushes up the LCOE of a nuclear plant by around 80–100% and of solar by about 50%. A gas plant, whose costs are mostly fuel, moves much less.
How do I convert a fuel price to a cost per MWh of electricity?
Multiply the fuel price per GJ by the heat rate in GJ per MWh. A CCGT with a heat rate of 6.6 GJ/MWh (about 55% efficiency) burning gas at 8 per GJ has a fuel cost of 52.8 per MWh. Heat rate = 3.6 ÷ efficiency.
Is LCOE a fair way to compare solar with gas or nuclear?
Only partly. LCOE says nothing about when the electricity is produced or what it is worth at that moment, and it leaves out the system costs of balancing variable renewables (storage, backup, grid). Analysts add value-adjusted LCOE (IEA), levelized avoided cost or full system-cost studies.
What capacity factor should I use?
Use the long-term expected net output divided by nameplate output × 8,760 hours: 11–25% for solar PV (higher with trackers in sunny regions), 25–45% for onshore wind, 40–55% for offshore wind, 50–60% for mid-merit gas, 85–93% for nuclear. Our capacity factor calculator converts annual MWh to CF.

Sources & references

  1. IRENA (2024). Renewable Power Generation Costs in 2023
  2. Lazard (2024). Levelized Cost of Energy+ (LCOE+), version 17
  3. IEA & NEA (2020). Projected Costs of Generating Electricity 2020
  4. NREL — Annual Technology Baseline (ATB)

Embed this calculator

Free for blogs, installers, schools and NGOs. Copy the code below; it updates itself automatically.