Results

This reservoir pair stores 2.4 GWh of deliverable electricity (7.9 hours at 300 MW) with a round-trip efficiency of 75.7%, a typical daily-cycling duration. Each cubic metre holds 0.95 kWh, so head matters as much as volume. Arbitrage alone does not cover the levelized cost (119 vs 110 €/MWh); real plants also earn from capacity and grid services.
Energy delivered per full cycle
2.4GWh
3,147 MWh needed to pump it up
Round-trip efficiency
75.7%
generating 87.5% · pumping 86.6%
Discharge time
7.9h
at 300 MW, flow 87 m³/s
Charge time
10.5h
at 300 MW pumping
Gravitational energy (ideal)
2,725MWh
ρ·g·V·H, before losses
Reservoir drawdown
6.3m
1.6% of head; power stays steady below about 15%
Olympic pools
1,000
0.95 kWh per m³ of water
Arbitrage margin / yr
€36,164,992
300 cycles · spread 65 €/MWh
LCOS (incl. charging)
119€/MWh
capital + O&M alone 60 €/MWh
Simple payback
18 yr 11 mo
capex 600 M€
Equivalent battery containers
611
≈3.9 MWh per utility battery container
Where the pumping energy goes
Deliverable energy of your volume at other heads

Real pumped-storage plants for comparison (approximate)

PlantPower (MW)Storage (GWh)Head (m)Hours
Your design3002.384007.9
Dinorwig, UK1,728~9~500~5
Goldisthal, Germany1,060~8.5~300~8
Bath County, USA~3,000~24~380~8–11
Cruachan, UK440~7~365~16
  • Head varies as the reservoirs fill and empty; this model uses the mean head. Large drawdown relative to head reduces power and efficiency at the end of discharge.
  • Evaporation, seepage and environmental flow constraints are ignored. Revenue counts energy arbitrage only; ancillary services (frequency response, inertia, reserve) often earn as much again.

Free calculator by GreenEnergy.net