Solar & wind farms in Costa Rica
Every utility-scale solar park and wind farm in Costa Rica tracked by Global Energy Monitor: operating, under construction and planned.
Solar PVOnshore windOffshore windCSPBuilding / planned
Costa Rica has 451 MW of utility-scale solar and wind capacity in operation across 35 tracked facilities, ranking #82 of 222 countries in this atlas.
Wind leads the fleet with 429 MW (95% of operating capacity), while solar parks add 22 MW.
The pipeline is substantial: 0 MW under construction and 352 MW in pre-construction or announced, equal to 78% of today’s operating fleet.
About 44 MW (10%) of the operating capacity started up in 2021 or later; the busiest year was 2015, with 71 MW commissioned.
The largest concentrations are in Guanacaste (416 MW), San José (15 MW), Cartago (13 MW).
Explore Costa Rica on the live map
See also: Costa Rica energy profile for the electricity mix, carbon intensity and history.
Capacity commissioned per year
Operating facilities by first start year (MW). Projects without a known start year are not included.
Largest operating solar & wind farms in Costa Rica
Map →| Facility | Type | Capacity | Since | Region | Owner |
|---|---|---|---|---|---|
| Chiripa wind farm | Onshore wind | 50 MW | 2014 | Guanacaste | Acciona Energía SAU |
| Guanacaste wind farm | Onshore wind | 50 MW | 2010 | Mogote, Guanacaste | Grupo Argos SA |
| Orosi wind farm | Onshore wind | 50 MW | 2015 | Mayorga, Guanacaste | Corporación Multi Inversiones (CMI) |
| El Quijote wind farm | Onshore wind | 34 MW | 2025 | Guayabo, Guanacaste | Inversiones Eólicas de Costa Rica SA |
| Molinos Viento Del Arenal wind farm | Onshore wind | 24 MW | 1997 | Guanacaste | Molinos de Viento del Arenal SA |
| Tilaran wind farm | Onshore wind | 23 MW | 1996 | Santa Rosa, Guanacaste | Corporación Multi Inversiones (CMI) |
| Cacao wind farm | Onshore wind | 21 MW | 2019 | Guanacaste | Coopeguanacaste RL |
| Tilawind wind farm | Onshore wind | 21 MW | 2015 | Cañas, Guanacaste | MPC Capital |
| Altamira wind farm (Costa Rica) | Onshore wind | 20 MW | — | Tilaran, Guanacaste | Corporación Multi Inversiones (CMI) |
| Campos Azules wind farm | Onshore wind | 20 MW | — | Tilaran, Guanacaste | Corporación Multi Inversiones (CMI) |
| Mogote wind farm | Onshore wind | 20 MW | — | La Fortuna, Guanacaste | Hunt Energy Horizons LLC |
| Vientos De La Perla wind farm | Onshore wind | 20 MW | — | Tilaran, Guanacaste | Corporación Multi Inversiones (CMI) |
| Vientos Del Miramar wind farm | Onshore wind | 20 MW | — | Tilaran, Guanacaste | Corporación Multi Inversiones (CMI) |
| Valle Central wind farm | Onshore wind | 15 MW | 2012 | San José | Constructora MECO |
| Los Santos wind farm | Onshore wind | 13 MW | 2011 | Cartago | Coopesantos RL |
| Vientos Del Este wind farm | Onshore wind | 12 MW | 2016 | Tilarán, Guanacaste | Grupo Ecoenergia |
| Rio Naranjo wind farm | Onshore wind | 9 MW | 2019 | Guanacaste | Coopeguanacaste RL |
| Buenos Aires de Pocosol solar project | Solar PV | 7.1 MW | 2019 | Alajuela | — |
| Aeroenergía wind farm | Onshore wind | 6.8 MW | 1998 | Santa Rosa, Guanacaste | — |
| Cabo Velas Cantón De Santa Cruz solar project | Solar PV | 5.8 MW | 2022 | Cabo Velas, Guanacaste | — |
| Valle Escondido CR solar project | Solar PV | 4 MW | 2021 | Guanacaste | — |
| Cantón De Carrillo solar project | Solar PV | 3.2 MW | 2017 | Guanacaste | — |
| Cantón De Bagaces solar project | Solar PV | 1.7 MW | 2017 | Guanacaste | — |
Biggest projects in the pipeline
| Project | Type | Status | Capacity | Expected | Region |
|---|---|---|---|---|---|
| Las Delicias solar farm | Solar PV | Announced | 78 MW | — | Puntarenas |
| ICE Colorado solar farm | Solar PV | Announced | 66 MW | 2027 | Colorado de Abangares, Guanacaste |
| Tejona wind farm | Onshore wind | Announced | 42 MW | 2002 | Santa Rosa, Guanacaste |
| Las Cañas solar farm | Solar PV | Announced | 20 MW | 2026 | Liberia, Guanacaste |
| Los Tecales solar farm | Solar PV | Announced | 20 MW | 2026 | Abangares, Guanacaste |
| Numu solar farm | Solar PV | Announced | 20 MW | 2026 | Carrillo, Guanacaste |
| La Montosa wind farm | Onshore wind | Pre-construction | 20 MW | 2027 | Guanacaste |
| Las Pavas wind farm | Onshore wind | Pre-construction | 20 MW | 2027 | Guanacaste |
| Movasa II wind farm | Onshore wind | Pre-construction | 20 MW | 2027 | Guanacaste |
| San Jorge (Costa Rica) wind farm | Onshore wind | Pre-construction | 20 MW | 2027 | Guanacaste |
| Energova Colorado solar farm | Solar PV | Announced | 16 MW | 2026 | Nandayure, Guanacaste |
| Los Mangos solar farm | Solar PV | Announced | 10 MW | 2026 | Carrillo, Guanacaste |
Top regions (operating)
Frequently asked questions
What is the largest solar farm in Costa Rica?
What is the largest wind farm in Costa Rica?
How much solar capacity does Costa Rica have?
How much wind power capacity does Costa Rica have?
How many solar and wind farms are there in Costa Rica?
Nearby countries
Brazil 58.2 GWMexico 21.2 GWChile 19.1 GWArgentina 6.8 GWColombia 2.5 GWPeru 2.1 GWUruguay 1.9 GWDominican Republic 1.8 GWPanama 1 GWHonduras 936 MW